For the past 13 years the Uptown Houston District has allowed Bob Lupher, RPLS (Lupher, LLC) to serve as the District's Survey Project Manager on all projects involving engineering design, construction, right of way, conveyance and/or easement rights.
.
San Felipe Road - Sage to IH 610
Uptown Edge - Pedestrian & Illumination project
San Felipe Road- Sage to IH 610
"Ambassador Way Drive" Reconstruction Project
Uptown Edge Pedestrian/Illumination project
Uptown Edge Pedestrian/Illumination project
Uptown Edge Pedestrian/Illumination project
Waterwall Park
Other Representative Projects:
Post Oak Boulevard - Richmond to IH 610
Sage Road - US 59 to Westheimer
District Wide Base Map
Blvd. Place infrastructure support
Guilford Court - Sage to Post Oak
Lynn Lane
Uptown Multi-Modal Transit Station
Uptown Park Blvd.
Hallmark Street - San Felipe to IH 610
CLIENT: TxDOT
Since 1996 Bob Lupher, RPLS has been serving TxDOT statewide as project manager on numerous projects.
Katy Freeway at Beltway 8 - Row Mapping and Final Monumentation of ROW
IH 10 ROW Mapping and Final Monumentation of ROW
Other Representative Projects:
SH 3 construction phase services
SH 36 ROW Mapping Project
FM 2218 Mapping Project
SH 105 Mapping Project
PR 38 Sheldon Lake Park
CLIENT: HARRIS COUNTY HOUSTON SPORTS AUTHORITY (H.C.H.S.A.)
Bob Lupher, RPLS served as Survey Program Manager to Owner (H.C.H.S.A.) on these two (2) fast paced projects. Toyota Center and Parking Garage (2003) went from original downtown development tracts to Rockets Basketball Team for their 2003 "opening night" basketball game within 2 years.
Toyota Center and Parking Garage
Toyota Center
Other Representative Projects:
Minute Maid Park
Harris County Jury Assembly Plaza
CLIENT: HARRIS COUNTY TOLL ROAD AUTHORITY
Bob Lupher, RPLS has worked on numerous toll road projects for Harris County over the past 20+ years.
West Sam Houston at Westpark Tollway Interchange
Westpark Tollway at Post Oak Blvd connection in Uptown Houston
Other Representative Projects:
Hardy Toll Road at FM 525
US 290 at West Sam Houston Tollway
CLIENT: METRO
Bob has served as Survey Project Manager to various prime contract engineering firms.
Representative Projects:
METRO Downtown Rail Switch Replacement
Southeast Rail Project
University Rail Project
Uptown Post Oak Blvd. Rail Project
CLIENT: PORT OF HOUSTON AUTHORITY
Bob Lupher, RPLS has been serving as a Survey Project Manager on two large port expansion projects as part of the LTRA/Jacobs/POHA team.
Bayport Terminal Wharf Expansion
Barbours Cut Terminal Wharf Expansion
Barbours Cut Terminal Wharf Expansion
Port of Houston Turning Basin High Level Road Reconstruction Project
CLIENT: WEST HARRIS COUNTY REGIONAL WATER AUTHORITY
Bob Lupher, RPLS has provided land survey services to WHCRWA over the past 10 years.
Contract 7A - FM 529 to Eldridge utilizing Private Easements, H.C.F.C.D.Right of Ways and Pipeline Easements
Other representative projects:
Established district wide horizontal and vertical controls and GIS basemap
Prepare waterline easements for waterline projects traversing between Municipal Utility Districts
Prepare route mapping & easement documents on Second Source Projects from Peek Road to Hempstead @ Gessner (13 miles)
Route mapping on Kinder Morgan ROW project from Colonial Parkway (IH 10) to Fry Road (7 miles)
CLIENT: CITY OF HOUSTON PUBLIC WORKS & ENGINEERING
Bob Lupher, RPLS has provided survey program manager or project manager services on City of Houston engineering projects for the past 30+ years.
Representative projects:
Fondren Road
Avenida de Las Americas
Safe Walk Sidewalk Program
Storm Water Management Project (citywide)
CLIENT: KLEIN INDEPENDENT SCHOOL DISTRICT
Lee Lupher, RPLS served as Project Manager for the past 10 years on over 50 existing and proposed school related sites for the Klein I.S.D., services including site acquisition, subdivision platting and engineering design (topographic) surveys throughout the entire district.
Representative projects:
Klein High School - Boundary survey, subdivision platting and engineering design survey for the "teardown/rebuild" of the entire Klein High School complex 100 acre campus.
Klein ISD School No. 5 Complex - Boundary survey, subdivision plat, engineering design topo, ROW design, dedication, construction staking, and as-built surveying for the future development of the multi-school campus
Klein ISD High School No. 6 Complex - Boundary survey, subdivision plat, engineering design topo, utility coordination and construction staking for the 160 acre tract
CLIENT: HOUSTON COUNTRY CLUB
Lee Lupher, RPLS served as the Survey Project Manager on numerous renovations around the Houston Country Club.
Houston Country Club
Houston Country Club Pro Shop
Representative projects:
Underground parking garage
Pro shop renovations
Fitness building renovations
CLIENT: WHISPERING PINES GOLF COURSE
Lee Lupher, RPLS served as Survey Project Manager for the relocation and construction of the owner's private residence on the golf course.
Topographic surveying approximately 10 acres, construction surveying and geodetic control network
CLIENT: CURTIS & WINDHAM ARCHITECTS
Lee Lupher, RPLS served as Survey Project Manager on several projects throughout the Houston and surrounding areas at the request of C & W Architects.
Representative projects:
Cat Springs, TX 1,000 acre ranch - Topographic surveying, construction stalking and geodetic control network
Shelby, TX 357 acre ranch - Topographic surveying and construction staking
Kenny, TX 171 acre ranch - Topographic surveying, construction and staking
River Oaks/Memorial/Museum District - Site acquisition, subdivision platting, topographic surveying and construction staking for over 15 high end residential tracts
CLIENT: VETERANS ADMINISTRATION
Lee Lupher, RPLS served as Survey Manager for several projects throughout the Houston, TX area.
Representative projects:
Michael E. DeBakey Veterans Administration Hospital proposed parking renovations
Houston National Cemetery - Horizontal/Vertical control, monumentation construction staking and as-built surveying services for 4,000 of the 3' x 8' size pre-placed crypts throughout section S-1
CLIENT: HARRIS COUNTY FLOOD CONTROL DISTRICT
Lee Lupher, RPLS served as Survey Manager for an on-call surveying contract with the District.
Representative Projects:
Boundary surveying for site acquisition of a 90 acre tract to serve as a regional detention pond
FEMA buyout investigation of over 94 structures in the Cypress Creek watershed